Blades TM1859 (14JUL04) 32-3201-3 700H Crawler Dozer 071404 PN=539 1—Cap Screw (3 used) 5—Pin (Welded On) 9—Shim (14 used) 13—Pitch Link Cover 2—Washer (3 used) 6—Bushing (6 used) 10—Cap (2 used) 14—Angle Cylinder (2 used) 3—Retainer (3 used) 7—Lubrication Fitting (2 used) 11—Washer (6 used) 15—Tilt Cylinder 4—Pin (3 used) 8—Socket 12—Cap Screw (6 used) 16—C-Frame 1. Lower all equipment to the ground. 9. Remove pitch link cover (13) and cap screw, remove link from pin. 2. Stop engine and operate control valves to relieve pressure in the hydraulic system. 10. Remove cap screws from pivot cap (12) and remove shims (9). 3. Attach lifting chain to blade. 11. Remove blade. 4.
Remove cap screw (1) and retainer (3) on left side. Drive upper and lower pins (4) out of tilt head end 12. Install blade, rubber bushings and pins. and angle cylinder rod end. IMPORTANT: When installing shims, install the 5. Remove rubber bushings. ball socket retainer without shims. Tighten cap screws and measure 6. Remove retainer (3) and cap screw (1) on right side gap. Install enough shims to fill gap on angle cylinder rod end plus one extra shim. 7. Remove rubber bushings. 13. Install pivot cap, cap screws. When tightening cap screws for pivot cap, angle blade to maximum on both sides. Tighten cap screw. CAUTION: The approximate weight of blade is 755 kg (1666 lb).
Blade—Specification Pivot Cap Screws—Torque.................................. 624 N•m (460 lb-ft) Blade—Specification Blade—Weight................................... 755 kg (1666 lb) (Approximate) 8. Install a chain and hoist to blade. CED,TX03399,6070 –19–17JUL02–2/2 32 3201 3