Control Linkage TM1859 (14JUL04) 32-3215-3 700H Crawler Dozer 071404 PN=543 1—Handle 10—Ball Joint (3 used) 18—Rod 26—Washer (2 used) 2—Nut 11—Nut (3 used) 19—Nut 27—Cap Screw (2 used) 3—Shaft with Arm 12—Sleeve 20—Ball Joint 28—Grommet (2 used) 4—Lock Nut (3 used) 13—U-Joint 21—Cap Screw 29—Boot 5—Ball Bearing 14—Cap Screw (4 used) 22—Washer (2 used) 30—Self-Locking Screw (4 6—Ball Joint 15—Washer (4 used) 23—Lock Nut (2 used) used) 7—Washer 16—U-Joint 24—Ball Joint (2 used) 31—U-Joint Control Housing 8—Bellcrank 17—Lock Nut 25—Plate Kit 9—Link (2 used) 1. Open access door to control valve. 9. Connect ball joints (10) at valves. 2. Disconnect ball joints (10) at valves. 10.
Install boot and cap screws (30). 3. Remove cap screw (21) and washer (7). 11. Tighten lock nuts (11) to specification. 4. Remove cap screws (14). T-Bar Control Valve Linkage—Specification 3/8 Jam Nut on Ball Joints— Torque..................................................... 24 N•m (18 lb-ft) (212 lb-in.) 5. Remove cap screws (30) from boot (2). Remove assembly. 12. Tighten lock nuts (19) and (23) to specification. 6. Disassemble and assemble parts as required. T-Bar Control Valve Linkage—Specification 5/16 Jam Nut—Torque........................ 13.5 N•m (10 lb-ft) (120 lb-in.) 7. Install assembly. T-Bar Control Valve Linkage—Specification 8.
Tighten cap screws (14) and (21) to specification. 3/8 Lock Nut—Torque.............................................. 41 N•m (30 lb-ft) T-Bar Control Valve Linkage—Specification 13. Adjust T-bar linkage. (See T-Bar Linkage Mount T-Bar Adjustment in Operation and Test Manual, Group Linkage-to-Hydraulic Tank Cap 9025-20.) Screws—Torque....................................................... 37 N•m (27 lb-ft) T-Bar Control Valve Linkage—Specification Bellcrank-to-Tank Mounting Cap Screws—Torque............................................... 73 N•m (54 lb-ft) CED,TX03399,6072 –19–17NOV00–2/2 32 3215 3