Control Linkage TM1859 (14JUL04) 32-3215-5 700H Crawler Dozer 071404 PN=545 Remove and Install Auxiliary Fifth Function Linkage –UN–11AUG00 T132691 1—Grip 5—Cap Screw 9—Yoke 12—Nut 2—Shifter Rod 6—Washer 10—Cotter Pin 13—Ball Joint 3—Boot 7—Rod 11—Pin 14—Lever Assembly 4—Lock Nut 8—Nut 1. Open access cover to control valve. 8. Install parts (11, 5, and 3). Tighten cap screw (5) to specification. 2. Remove pin (11). Auxiliary Linkage Fifth Function—Specification 3. Remove cap screw (5). Lever-to-Bracket Cap Screw— Torque....................................................................... 50 N•m (37 lb-ft) 4. Remove boot (3). 9. Adjust auxiliary fifth function lever control linkage.
(See Auxiliary Fifth Function Lever Linkage 5. Remove auxiliary linkage assembly. Adjustment in Operation and Test Manual, Group 9025-20.) 6. Disassemble parts as required. 7. Assemble parts and install auxiliary linkage assembly. CED,TX03399,6115 –19–17NOV00–1/1 32 3215 5