Hydraulic System 1—Blade Tilt Cylinder "Right" 3—Blade Tilt Cylinder "Left" 4—Hydraulic Control Valve 6—Cylinder Head End Hose Rod End Port Head End Port 5—Cylinder Rod End Hose 7—Tilt Cylinder 2—Blade Tilt Valve Section CED,TX03399,6084 –19–31MAR00–2/2 Remove and Install Tilt Cylinder 1. Lower all equipment to the ground. 2. Stop engine. Operate all hydraulic controls to release pressure in hydraulic system. CED,TX03399,6085 –19–31MAR00–1/2 TM1859 (14JUL04) 32-3260-25 700H Crawler Dozer 071404 PN=577 CAUTION: To avoid injury from escaping fluid under pressure, stop engine and relieve the pressure in the system before disconnecting or connecting hydraulic or other lines.
Tighten all connections before applying pressure. 3AUG88 3. Tag and disconnect cylinder hoses (3 and 4). Close all opening using caps and plugs. –UN–2 4. Attach cylinder to hoist using lift strap. X9811 CAUTION: Use a lifting device for heavy components. 5. Remove cap screw and retainer and remove pin (2). Remove cap screws and retainers on tilt cylinder head end and angle cylinder rod end. Drive tilt cylinder pin (1) and angle pin out. –UN–20JUL00 6. Remove cylinder. 7. Inspect rubber bushings, replace if necessary. T132534B 8. Install cylinder and pins. Connect tilt cylinder hoses.
(See Tilt Cylinder-to-Control Valve Component 1—Tilt Cylinder Head End Pin/Angle Cylinder Rod Location in this group for hose routing.) End Pin 2—Tilt Cylinder Rod End Pin 3—Tilt Cylinder Rod End Hose 4—Tilt Cylinder Head End Hose CED,TX03399,6085 –19–31MAR00–2/2 32 3260 25