John Deere 700H Crawler Dozer — Remove and Install Lift

Hydraulic System 1—Lift Cylinder Blade "Raise" 3—Blade Lift Valve Section 5—Cylinder Rod End Hose 7—Cylinder Head End Hose Rod End Port 4—Hydraulic Control Valve 6—Right Lift Cylinder 8—Left Lift Cylinder 2—Lift Cylinder Blade "Lower" Head End Port CED,TX03399,6088 –19–31MAR00–2/2 Remove and Install Lift Cylinder 1. Lower all equipment to the ground. 2. Stop engine. Operate all hydraulic controls to release pressure in hydraulic system. CED,TX03399,6089 –19–31MAR00–1/2 TM1859 (14JUL04) 32-3260-31 700H Crawler Dozer 071404 PN=583 CAUTION:

To avoid injury from escaping fluid under pressure, stop engine and relieve the pressure in the system before disconnecting or connecting hydraulic or other lines. Tighten all connections before applying pressure. 3AUG88 3. Tag and disconnect cylinder hose (1) and line (2). Close all opening using caps and plugs. –UN–2 4. Attach cylinder to hoist using lift strap. X9811 CAUTION: Use a lifting device for heavy components. 5. Remove cap screws and remove pins (3 and 4). 6. Remove lift cylinder. –UN–20JUL00 7. Install cylinder and pins. Connect lift cylinder hose and line.

(See Lift Cylinder-to-Control Valve Component Location in this group for hose routing.) T132536B 1—Cylinder Rod End Hose 2—Cylinder Head End Line 3—Head End Pin 4—Rod End Pin CED,TX03399,6089 –19–31MAR00–2/2 32 3260 31