Deutz TCD 2015 — OBJ BUCH-190-001

TCD 2015 Railway Exhaust system/Charging W 06-06-04 Removing and installing turbocharger (B-bank) Commercial available tools Collect leaking operating substances in suitable vessels and dispose of according to regulations. – Fitting compound DEUTZ S1 6 Removing turbocharger Unscrew union nuts (1). Remove lubricating oil pipe (2). 1 2 1 © 42056-1 Unscrew screws (1). Remove oil return pipe (2). 1 Remove gasket. 2 © 42057-1 © 06/2006 8205-001 1/6