Deutz TCD 2015 — OBJ BUCH-190-001

TCD 2015 Railway Fuel system W 07-10-06 Mount hose line (2). Mount new sealing rings. Screw on hollow screw (1). 1 2 6 © 42112-1 Position cable harness rail with cable harness. Position pipe clamp (arrow). Fasten screws. Note different screw lengths: M6 x 12 mm (1) M6 x 16 mm (2) 1 Tighten screws . 1 A13 094 2 © 42111-1 Position hose line (1). Observe installation angle dimension X = 10°. 1 Tighten hollow screw (2). A12 090 X 1 2 © 45910-2 © 06/2006 8224-001 5/6