TCD 2015 Railway Lube oil system W 08-04-06 Installing the oil suction pipe Mount holder (1). Tighten screws (2). A08 016 2 1 6 © 42171-1 Clean sealing surfaces. Mount new gasket. Mount oil suction pipe. Fasten screws. Ensure that the installation location is free from faults. Note different screw lengths: M8 x 25 mm (1) M8 x 20 mm (2) 1 2 © 42170-1 Tighten screws (1). A08 015 Tighten screws (2). A08 016 Attention! Install tension-free! Install lubricating oil pan (Railway). W 08-04-07 1 2 © 42170-1 © 06/2006 8229-001 2/2