1. POWER CIRCUIT The negative terminal of battery is grounded to the machine chassis through master switch. When the start switch is in the OFF position, the current flows from the positive battery terminal as shown below. 1) OPERATING FLOW Battery Battery relay Fusible link CN-60 Fuse box No.1 l/conn CN-8(12) Start switch CS-2(1) CR-35(30)] Fuse box No.2 Power relay I/conn CN-10(1) Room lamp CL-1(2) Door switch CS-1 GPS connector Cassette radio CN-27(11) CN-125(1) Fuse box No.4 I/conn CN - 5(4) I/conn CN -17(5) Wiper motor controller CN-141(7) Wiper motor CN-21(4) Fuse box No.5 MCU CN-50(7) Fuse box No.18 l/conn CN-11(3) AC controller (11) Blower (2) I/conn :
Intermediate connector 2) CHECK POINT GND : Ground 4-4 Engine Start switch Check point Voltage OFF OFF - GND (Battery 1EA) - GND (Battery 2EA) - GND (Battery 2EA) - GND (Fusible link) 10~12.5V 20~25V 20~25V 20~25V