. OPERATION OPERATION OPERATION OPERATION stockpile, keep the cutting edge of loading blasted rock, have the REMARK up and down while pushing in the will cause the tires to slip. 3 - 112 3. Whe the bucket horizontal; wh buck et tilting slightly down Be c areful not to get blast ed rock under the bucket. T his will mak e the front tires come off the ground and slip. Try t o keep the load in the center of the bucket; if the lo ad is on one side of the bucket, the load will be unbalanced. 4. At th raise e same time as thru the lift arm to prevent sting the bucket into the m the bucket from going in too aterial, far. By raisi tires ng the lift arm, ample traction will be produced by the front .
If the bu machine cket is thrust too muc stops moving forwar h and the lift arm stops risin d, release the accelerator g or the pedal a little. Pr oper operation of the a ccelerator pedal for each typ e of the soil is eff ective for saving of fue l and prevention of wear of t he tires. 5. Che bucket, then operate the bucket co ntrol lever to tilt the bucket a nd load the b REMARK If the bu bucket a nd digging, the front tir 6. If the re is too much materia l loaded in the bucket, dump and tilt the bucket quickly to re prevents spillage of the lo move the excessive load. This ad during hauling.