Komatsu — OPERATING AUTO-GREASING SYSTEM

. OPERATION OPERATION OPERATION OPERATION 3 - 147 1) One person removes plu there. If it is necessary to ble remove this plug (4) and This plug is installed to t injector. 2) The other person presse the grease pump. 3) Discharge the grease co cases) from the injector. the grease pump. 4) Tighten plug (4) of the in It is impossible to see if t in the grease, the auto-g To see if the greasing s in the specified (operatin 1) One person removes plu g (4) from one injector, then stays ed the air from the main piping, bleed the air.

he manifold end of each terminal s the auto-greasing switch to start 3) Discharge the grease co ntaining air (milky white in many If normal grease comes out, stop 4) Tighten plug (4) of the in jector to prevent the grease from leaking he air has been bled by simply checking t he pressure gau ge. Even if air is mixed rease system operates since the discharge pressure of th e grease pump is high. ystem is working normally, check that the grease pump is balanced and stopped g) time (60 seconds). ressure switch This work shall be h (6) fitted to block (5) installed to e at the rear left of the cab, then he auto-greasing switch in the e grease pump.

ilky white in many cases because from block (5). mes out, stop the grease pump. 6) to block (5). eakage of grease.) supply line d by two persons. ine pressure gauge (7) fitted to block (5), then wait. auto-greasing switch in the operator's cab to start the grease pump. ilky white in many cases because of the air) is discharged from block (5). mes out, stop the grease pump. re gauge (7) to block (5). eakage of grease.) 3. Method of bleeding air from p ressure switch This work shall be performed by two persons. 1) Remove pressure switc the auto-greasing devic wait.

2) One worker presses t operator's cab to start th 3) Grease containing air (m of the air) is discharged When normal grease co 4) Install pressure switch ( (Check that there is no l performed by two persons. 1) Remove pressure switc h (6) fitted to block (5) installed to e at the rear left of the cab, then he auto-greasing switch in the e grease pump. 3) Grease containing air (m ilky white in many cases because 4.

Method of bleeding air from This work shall be performe 1) Remove supply grease l 2) One worker presses the 3) Grease containing air (m When normal grease co 4) Install supply line pressu (Check that there is no l This work shall be performe 1) Remove supply grease l ine pressure gauge (7) fitted to block (5), 2) One worker presses the auto-greasing switch in the operator's cab to start the gre 3) Grease containing air (m ilky white in many cases becaus e of t he air) is discharge NOTICE If air is left in the circuit, the grease p ressure will not rise to the specified level or will take a long time to rise to the specified level, and t he injector will not work norma lly.