35 HD325, 405-6 Order of work Work procedure 1. Weld the front plate. (See page 38, 39.) 2. Weld the bottom plate on the level. (See page 38, 39.) After welding the ribs, secure the mudguard mounting plate removed before by tack weld- ing at the angle of the plate installed to the bottom plate, then weld it. Check the mounting hole pitch with mating plate (566-74-41521). 3. Remove the stands (4 pieces) for transporta- tion installed to the bottom plate. 4. After finishing the welding work, remove the spatters and finish the beads with a grinder. 5. Check the welded parts for a defect. (1) Check the deposited metal. (2) Check for an undercut, overlap, and spat- ter.
(3) Check the leg length of weld for short- age (Insufficient leg length is not permit- ted.) • Apply arc welding to the front plate in verti- cal position. Observe the welding condition shown in Table 1. • Put a stand under the rear part of the bottom plate to keep the bottom plate on the level. • Perform back-step welding to connect beads and start welding.