51 HD325, 405-6 Order of work Work procedure 6. Turn over the body. Install a sling to the body hinge holes of the bottom plate to turn over the body. Keeping the body in the position shown at left (lifted with a crane), weld the inside of the front plate. Then, lower the body and weld the inside of the bottom plate. • Put wood blocks under the front and rear parts of the bottom plate. • Connect the ground cable for welding to the body securely. • Apply CO2 gas shielded arc welding as stan- dard. If it is difficult to apply, however, apply arc welding. • Drying time of arc welding rod (1) Temperature: 150 – 200ºC (2) Time: 120 minutes