55 HD325, 405-6 Order of work Work procedure 1. Weld the protector. (1) Place the protector on the tops of the side plate and front plate with a crane. • Capacity of crane: Min. 2 tons • Lift of crane: Min. 7 m • Breaking strength of wire rope, chain, chain block: Min. 2 tons (2) Position the protector so that the end of the body side plate will be in parallel with the protector side plate. (3) Cut the front and side plates of the pro- tector with gas so that the top of the body side plate and will be in parallel with the top of the protector. Note:
Since the protector and front plate are distorted by welding as shown below, the front and side plates of the protector must be cut with gas so that the clear- ance will be minimized at the time of welding. (Reduce the clearance to be- low 3 mm.) (4) After positioning, tack-weld the front panel of the protector. • If any plate is used to secure the protector, remove it with a gas cutting device or a grinder.