7 HD325, 405-6 Order of work Work procedure 1. Install the right front tire. 1 569-22-62841, 12 pieces, Clamp 2 569-22-62870, 24 pieces, Nut • Fix clamps 1 with nuts 2. • Fix the clamps in the numerical order shown in the figure. • Tighten the nuts to the following torque. • When LM-G is applied to the threads and nut seats 84 – 105 kg·m (Target: 94.5 kg ·m) • When nothing is applied to the threads and nut seats 110 – 135 kg·m (Target: 123.0 kg·m) • Reduce the sideways runout of the tire to be- low 5 mm.