. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE NOTICE 4 - 42 6. After cleaning, i nstall the elemen t to the When doin be careful installation Set so that the s urfac e with the m ark shown in (6) is at the top, then i nstall 7. Install the c over (4). 8. Tighte n nut (3). Tightening torque: 10 to 14 Nm ( 1.0 to 1.4 kgm 2 to 10.1 lbft) If the eleme nt is excessively dirty, or if it is damaged, replace it with a new part.