24. SERVICE PROCEDURE 24.4 EVERY 250 HOURS SERVICE Maintenance for the 50 hours service should be carried out at the same time. 24.4.1 LUBRICATING 1. Lower the work equipment to the ground, then stop the engine. 2. Using a grease pump, pump in grease through the grease fittings shown by arrows. 3. After greasing, wipe off any old grease that was pushed out. l Power tilt dozer 1. Lift cylinder support yoke (4 places) 2. Lift cylinder support shaft (2 places) 3. Lift cylinder ball joint (2 places) 4. Tilt cylinder ball joint (1 place) 5. Tilt brace ball joint (1 place) 6. Brace ball joint (2 places) 7. Tilt brace thread (1 place) 3-48