Hitachi Construction Machinery — Engine Speed

OPERATIONAL PERFORMANCE TEST / Engine Test Measurement: 1. Measure the items as shown in the table below. 2. When measuring, set the switch and test condi- tion as shown in the table below in response to the engine speed to be measured. Evaluation: Refer to Operational Performance Standard in Group T4-2. Remedy: Refer to Troubleshooting B in Group T5-7. NOTE: ECO stands for the auto engine speed re- duction system by 1600 min -1 . Switch Panel: Monitor Unit: Digging Mode T1V1-04-03-001 M1J1-01-002 T4-3-2 Item Engine Control Dial Power Mode Switch Auto-Idle Switch Work Mode Test Conditions Slow Idle Min. Speed P OFF Digging Mode Fast Idle (With ECO deac- tivated) Max.

Speed P OFF Digging Mode Check in the Dr. ZX special functions with ECO deacti- vated. Measure engine speed with the lever in neutral. Fast Idle (Relief operation) Max. Speed P OFF Digging Mode Measure engine speed while relieving the boom raise circuit. Fast Idle (E mode) Max. Speed E Mode OFF Digging Mode Fast Idle (HP mode) Max. Speed HP Mode OFF Digging Mode Measure engine speed while relieving the boom raise circuit. Auto-Idle Max. Speed P ON Digging Mode Check engine speed 4 sec- onds after returning all control levers to neutral. Engine Control Dial Auto-Idle Switch Power Mode Switch