. OPERATION TROUBLES AND ACTIONS Battery Removal and Installation hood (1) and lock in position securely with the cover mounting bolts (3) (3 places), then remove 3. Remove vinyl cover (4) installed to the top of the battery. Installing of Battery NOTICE 3 - 194 Removal of B 1. 2. 1. Open eng hood sup Remove battery in 4. Disconne side) first. 5. Remove c onnection cable (7) and cabl e (6) from t (+) termin 6. Remove mounting bolts (8 ) (2 places), then remov holder (9) and vinyl cover 7. Pull the b attery to the outs ide of the machin Afte r securing t he battery, check t hat it does not mov e. If it moves, t ighte 1. Place the battery in the sp ecified position. 2.
Fix the ba ttery securely wi th mounting holde r (9) a nd mounting bolts (8). When sec uring the battery in place install vin yl cover (4). ue for mounting bolts: 9.8-19.6 Nm (1-2 kgm, 7.2-14.5 lbft) itive (+) terminal end. (7) from the (+) terminal. egative terminal (-) (grounding side). over (2). Permissib le tightening torq ue for mounting bolts: 9 .8-19.6 Nm (1-2 kgm, 7.2-14.5 lbft 3. Install cab le (6) at the pos itive (+) terminal e nd. 4. Connect c onnection cable (7) from the (+) t ermina 5. Connect c able (5) to the n egative terminal ( -) (grounding side) 6. Install bat tery inspection c 7. Close eng ine hood (1).