Komatsu — SAFETY CRITICAL PARTS LIST

. MAINTENANCE SAFETY CRITICAL PARTS SAFETY CRITICAL PARTS LIST 4 - 13 SAFETY CRITICAL PART S For usi ng the machine safel y for an exten ded perio d of time, you mus t periodically r eplace the s afety crit ical and f ire prevention-relate d parts list ed in the table of important part s. Materia l quality o f these par ts can chang e as time passes a nd they are lik ely to w ear out or d eteriorate . However, it is diffi cult to determine the extent of wea r or deterioration a t the time of pe riodic m aintenance. Hence, it is required to r epla ce them with new o nes regardle ss of the ir conditio n after a certain period of usage.

This is important to mportant ensure that these parts mai ntain their full performance at al l times. Further more, should anythin g abnormal b e found o n any of t hese parts, repl ace it w ith a new on e even if t he periodic replace ment time for the pa rt has not yet arrived. If any o f the hose clamps sh ow deteriorat ion like d eformati on or cracking, replace the clamps at the sa me time as the hos es. rform the following checks with hydraulic hoses which need to be replaced periodically. Tighten all loose and replace defective hoses, as required. eplacing hoses, always replace O-rings, gaskets, and other such parts at the same time. our Komatsu distributor replace the critical parts.

Als o pe clamps and replace defectiv e hoses, as r equired. When r eplacing h oses, alwa ys replace O -rings, g askets, a nd other such p arts at the same ti Have y our Komatsu distribu tor replace th e critical parts. No.

Safety critical parts for periodic replacement Q'ty Replacement interval 1 F uel hose (fuel tank - injection pump) 2 Every 2 years or 4000 hours, whenever comes sooner 2 F uel return hose (return - fuel cooler inlet port) 1 3 F uel cooler return hose (fuel cooler outlet port - fuel tank) 1 4 P ump outlet hose (pump - control valve delivery hose) 3 5 P ump outlet hose (pump - control valve PP hose) 1 6 P ump outlet hose (pump - control valve LS hose) 1 7 Work equipment hose (boom cylinder - control valve) 4 8 Work equipment hose (arm cylinder - control valve) 4 9 Work equipment hose (bucket cylinder - control valve) 4 10 Work equipment hose (blade cylinder - control valve) 4 11 A ttachment additional line hose (plug at tip - control valve) 4 12 S wing line hose (swing motor - control valve) 2 13 T ravel line hose (travel motor - control valve) 4 14 M ain suction hose 2 15 A ir conditioner heater hose 2 16 A ccumulator (for control circuit) 1 17 A ccumulator (for additional, low pressure attachment circuit) 1 18 S eat belt 1 Every 3 years after beginning to use or 5 years after manufacturing of seat belt, whichever comes sooner