. MAINTENANCE MAINTENANCE PROCEDURE MAINTENANCE MAINTENANCE PROCEDURE 4 - 51 2) Run th e engin e at l ow idle and swing the work e quipment 90° to bring it to the side of the track. 3) Jack u p the m achine until the track is the gro und. R otate the trac k under no loa d for 2 minutes. Repea t this pr ocedure on b oth the left and right s ides. 8. Bleeding a ir from attachment ( when installed) NOTICE If the attachmen t maker specifies an air bleeding procedure for t he attachment itse lf, follow the specified p rocedure to blee d the air. f a breake r or oth er attachmen t has been i nstalled, ru n the engine at lo w idle a nd operate th e attachment p edal epeatedly (appro x.
10 times) until the air has been b led from the attachment circuit. NOTICE After complet ing the air bleeding op eration, s top the engine, and leave the machine for 5 minutes befor e starting operations. This will rem ove the a ir bubbles in t he oil inside the h ydrauli c cylinders. Chec k that th ere is no leakage of oil and wipe of f any oil that has been