. MAINTENANCE MAINTENANCE PROCEDURE WARNING in the control circuit. Even work equipment to go down CHECKING FUNCTION OF ACCUMULATOR the maximum reach (arm fully dumped) and hold the work 4 - 88 CHECKING CHARGE PRESSURE OF NITROGEN GAS IN ACCUMULATOR (F CIRCUIT) The ac cumulator is charged with high- pressure nitrogen gas, so mistaken operation may cause a n explosion, which will lead to seriou s injury or damage. When handli ng the accumulator, always do as fo llows. The pressure in the hydraulic circui t cannot be completely removed. W hen removing the hydr aulic equipment, do not stand in t the he direction that the oil spurts o ut when carrying out the operation.
I n addition, loosen the b olts slowly when carrying out operation. r. e of it in fire. ny impact. Do not disassemble the accumulato Do not bring it near flame or dispos Do not make holes in it or weld it. Do not hit it, roll it, or subject it to a Wh en disposing of the accumulato r, the gas must be released. Please contact your Komatsu distributor to have this work car ried out. FUNCTION OF ACCUMULATOR The a ccumulator stores the press after t the fo he engine is stopped, the co llowing actions are possible. If t eq un he control lever is operated i uipment, it is possible for th der its own weight. Th e pressure in the hydraulic c The a ccumulator is installed to the on th e right.
Repla ce the accumulator every 2 years or every 4000 hours, whichever comes sooner Chec k the nitrogen gas charge pre 1. S 2. S e e 1. S top the machine on firm, leve 2. S et the work equipment to t xtended and bucket fully quipment at a position 1.5 m NOTIC E out the following procedure to lower the work equipment to the ground within 15 seconds of stopping the engine. Carry out the following procedure to lo wer the work equipment to the grou nd within 15 seconds o When the engine stops, the pressure in the accumulator gradually goes dow n, so inspection can o nly be carried out immediately after t he engine is stopped.