hitachi — Voltage and Current Measurement

TROUBLESHOOTING / Electrical System Inspection Engine Specification Starting Circuit Started Started Started Started Started Started Started Started Started Started Started Started Started Started Started 20 to 25 V 20 to 25 V 20 to 25 V 20 to 25 V 20 to 25 V 20 to 25 V 20 to 25 V 20 to 25 V 20 to 25 V 20 to 25 V 20 to 25 V 20 to 25 V 20 to 25 V 5 V 20 to 25 V NOTE: *Before measurement, disconnect the negative cable from the battery. T5-7-12 Key Switch Location to be Measured START START START START START START START START START START START START START START START Between (18) and Ground: Key Switch Between (19) and Ground: Battery Relay (Coil) Between (20) and Ground:

Battery Relay (Switch) Between (21) and Ground: Starter (B) Between (22) and Ground: Starter (C) Between (23) and Ground: Starter Relay 2 (S) Between (24) and Ground: Starter Cut Relay Between (25) and Ground: Fuse Box Between (26) and Ground: Fuse Box Between (27) and Ground: ICF (C7) Between (28) and Ground: Monitor Unit (A7) Between (29) and Ground: MC (B16) Between (30) and Ground: ECM (1-24) Between (31) and Ground: ECM Main Relay Between (32) and Ground: ECM Main Relay