Contents Page Page Adjusting Rate of Implement Drop......................50-4 Rate of Lift Adjustment .......................................50-4 Depth Adjustment...............................................50-5 Load/Depth Adjustment......................................50-5 Float Position......................................................50-7 Direct Actuation ..................................................50-7 Three-Point Hitch................................................50-7 Quick-Coupling (Hook-Type) Draft Links............50-8 Attach Three-Point Hitch Mounted and Drawn Implements .......................................50-10 Leveling the Implement ....................................50-10 Center Link .......................................................50-11 Quick-Coupling (Hook-Type) Center Link.........50-11 Hydraulic Center Link .......................................50-13 Remote Control of Hydraulic Center Link.........50-14 Center Link Positions........................................50-14 Lift Links ...........................................................50-15 Adjust for Vertical Float.....................................50-16 Sway Blocks (If Equipped)................................50-16 Stabilizer Bar (If Equipped)...............................50-17 Stabilizing System (If Equipped).......................50-17 Adjusting Spreading Dimension .......................50-18 Hydraulic Stabilizer Bars (If Equipped).............50-19 Adjusting the Spreading Dimension on Hydraulic Stabilizer Bars..............................50-20 Fine Adjustment of Rear PTO Speed (Shiftable PTO) ..............................................55-5 Operating the PTO by Fender Control................55-6 Attaching PTO-Driven Equipment ......................55-7 Ballast Selecting Ballast.................................................60-1 Ballasting Rear Wheels ......................................60-1 Measuring Rear Wheel Slip................................60-1 Installing Weights on Flanged Axle ....................60-2 Filling Tires With Liquid Ballast...........................60-2 Draining the Tires ...............................................60-3 Pre-Assembling the Pick-Up Weight ..................60-3 Attaching to Three-Point Hitch (Rear-End Attachment) ..................................60-5 Attaching to Basic Weight...................................60-6 Attaching to Three-Point Hitch (Front-End Attachment)..................................60-8 Weight in the Three-Point Hitch..........................60-8 Installing Front Weights......................................60-9 Additional Weight Package 180 kg (400 lb)........60-9 Wheels, Tires Use of Dual Wheels (easy-to-attach)..................65-1 Change Wheels Safely.......................................65-1 Check Front Wheel Toe-In..................................65-2 Adjust Toe-In (Tractors with Front-Wheel Drive Axle).................................65-2 Adjusting Tread on Front Wheels (Adjustable Rims)...........................................65-3 Tighten Wheel Nuts on Front Wheels.................65-3 Adjusting the Fixed Fenders...............................65-4 Adjusting the Pivoting Fenders...........................65-5 Adjusting Tread on Rear Wheels (Adjustable Rims)...........................................65-7 Tread Widths ......................................................65-7 Tire Pressures ....................................................65-8 Service Tires Safely............................................65-8 Tire Combinations (up to 40 km/h; 25 mph) .......65-9 Tire Combinations (up to 50 km/h; 31 mph) .....65-10 HMS — Headland Management System HMS Headland Management System (If Equipped)......................................51-1 HMS, Possible Functions ...................................51-2 HMS, Controls ....................................................51-4 HMS, Programming with Tractor Stationary (Edit Mode) ...................................51-5 HMS, Programming with Tractor Stationary, Example .......................................51-6 HMS, Programming with Moving Tractor (Learn Mode) .....................................51-7 HMS, Programming with Tractor Moving, Example............................................51-8 HMS, Performing the Stored Programs..............51-9 TIA — Tractor-Implement Automation Tractor-Implement Automation (TIA) ..................52-1 Tractor-Implement Automation — Safety ...........52-1 Operating the Tractor-Implement Automation ....52-1 Requirements for PTO........................................52-1 Requirements for E-SCVs/E-ICVs......................52-2 Requirements for AutoPowr ...............................52-2 Additional Equipment — Hydraulic System Selective Control Valves.....................................70-1 Adjustment of Pressure Limit at Series 300 and 350 Selective Control Valves ...........70-1 Levers for Mechanical Selective Control Valves ................................................70-2 Levers for Electronically Controlled Selective Control Valves (E-SCVs) ................70-3 Additional Functions for Electronic Control Valves (E-SCVs and E-ICVs) ............70-4 Multi-Function Lever (Mechanical) .....................70-9 Mechanical Multi-Function Lever with Front-Loader Dampening.............................70-10 Multi-Function Lever (Electrical).......................70-11 Rate of Cylinder Operation...............................70-12 Couplers ...........................................................70-12 Hose Unions.....................................................70-12 Power Take-Off PTO Guard .........................................................55-1 Operating Instructions ........................................55-2 PTO Options.......................................................55-2 PTO Speeds.......................................................55-2 Front PTO...........................................................55-3 Operating Power Take-Offs ................................55-3 Select Standard Speed of Rear PTO (Shiftable PTO) ..............................................55-4 Continued on next page iii 030612 PN=3