PIPER COMANCHE SERVICE MANUAL A ... RETARD CONTACT OPENING POINT MAIN CONTACT OPENING POINT TIMING MARK --~~tD.~ ORIVE MEMBER FIGURE 7B·8. MAGNETO TIMING MARKS c. Remove am secuMJ nut and lift cut cam. Position distributor finpr on cam fiance and file a notch on edge of cam flan,e aliped with proper timiDi mark an finter. (Refer to Figure 1B·I0,) RqJosition cam on rotor and iastall sec:urinl nut flush with end of rotor shaft. Be sure notch on cam can be seen when looking in contaCt assembly end of rnqnero. d. Loosen drive shaft nut and install the 11-846' Holdinl Toolan rotor shaft as shown in Figure 1B·l1. Slide the 11-8464 Timin, Pointer Oft rotor shaft between drive plate and oil slinger.
Securely tighten nut and washer down on holdiftl tool. Place mapcco in venical position. drive end up. 10"7 ~0.313 1.000 1.250 -+,+0.,25 FIGURE 78-9. REWORKED PLAIN WASHER POWER PLANT ISSUED: B/18/72 2 F14