TESTING AND ADJUSTING PM CLINIC SERVICET Pm CLINIC UNDERCARRIAGE CHECK SHEET D85PX-15 Serial No Measure the bushing temperature immediately after operations Left side of machine Right side of machine Opening of track link Left track A: Clearance between links Pin No. 1.4 Right track A: Clearance between links Pin No. 1.4 D85EX-15 20-211 (2) Work order No. Date Service meter Serviceman / / h Measurement results Pass Fail Measurement results Pass Fail