TROUBLESHOOTING ERROR CODE DB22KK ERROR CODE DB22KK (ENGINE CONTROLLER LOAD POWER SUPPLY: SOURCE VOLTAGE REDUCTION/INPUT (KK)) D85EX-15 20-469 (5) Action code Error code Controller code Trouble Engine controller load power supply: Source voltage reduction/ input (KK) (Engine controller system) CALL E04 DB22KK ENG Contents of trouble • Load source voltage of engine controller is below 17V. Action of controller • Flashes caution lamp and turns on caution buzzer. • Limits operation of engine, transmission, and brake. Problem that appears on machine • Engine may stop during operation or engine may not start. • Once machine is stopped, engine speed is limited to medium (half).
• Once machine is stopped, it cannot travel any more. Related information • Charge level (voltage) of battery can be checked in monitoring mode. (Code 03200: Battery voltage) • Method of reproducing error code: Turn starting switch ON. aThis error code detects abnormality in engine controller load power supply. Possible causes and standard value in normal state Cause Standard value in normal state/Remarks on troubleshooting 1 Defective fuse (FS1-2) If fuse is burnout, circuit probably has short circuit with chassis ground. 2 Defective fusible link (96A) If fusible link is burnout, circuit probably has short circuit with chassis ground.
3 Defective engine controller load power supply relay (Internal disconnection) aPrepare with starting switch OFF, turn starting switch ON and carry out troubleshooting. If error code lights on (reset display) by replacing right con- nector with other relay, engine controller load power supply relay is defective. PPR 4 Disconnection in wiring har- ness (Disconnection in wir- ing or defective contact in connector) aPrepare with starting switch OFF, then carry out troubleshooting without turning starting switch ON. Wiring harness between EGC3 (female) (1), (2), (21) – PPR (female) (3) Resistance Max. 1z Wiring harness between PPR (female) (5) – FS1-2 outlet port Resistance Max.
1z Wiring harness between FS1-2 inlet port – fus- ible link – battery relay terminal C Resistance Max. 1z 5 Short circuit with chassis ground in wiring harness (Contact with ground circuit) aPrepare with starting switch OFF, then carry out troubleshooting without turning starting switch ON. Short circuit of wiring harness between EGC1 (female) (13), (19) – starting switch 270 with chassis ground Resistance Min. 1Mz Short circuit of wiring harness between starting switch 250 – CB1 – FS2 (5) with chassis ground Resistance Min. 1Mz Wiring harness between FS2 (5) – fusible link – battery relay terminal H Resistance Min.
1Mz 6 Defective engine controller aPrepare with starting switch OFF, turn starting switch ON and carry out troubleshooting. EGC3 Voltage Between (1), (2), (21) – (11), (31), (32) 20 – 30V