Komatsu — DISCONNECTION

DISASSEMBLY AND ASSEMBLY POWER TRAIN UNIT 17. HSS assembly 1) Set the power train assembly on blocks [1] and [2]. 2) Sling HSS assembly (26) temporarily. 3) Remove the mounting bolts and separate HSS assembly (26) from transmission assem- bly (27). 4) Sling PTO assembly (28) temporarily and remove the mounting bolts. 5) Sling PTO assembly (28) to separate it from transmission assembly (27). a The torque converter assembly will be left on the transmission side. 4 PTO assembly: 300 kg 4 HSS assembly: 750 kg 19. Remove 8 mounting bolts. Using eyebolt [4], lift off torque converter assembly (33). 18. PTO assembly 1) Set the power train assembly on block [3] with PTO assembly (28) up.

2) Remove coupling (29) and retainer (30). [3*] 3) Remove sleeves (31) and (32). 30-60 D85EX-15 (2)