Komatsu — MAIN RELIEF VALVE

STRUCTURE, FUNCTION AND MAINTENANCE STANDARD MAIN RELIEF VALVE MAIN RELIEF VALVE Main relief, torque converter relief valve A: Drain port (for torque converter relief) B: Drain port C: From pump D: Drain port E: To torque converter P1: Main relief oil pressure detection port P2: Torque converter relief oil pressure detection port 1. Body 2. Piston 3. Torque converter relief valve 4. Piston 5. Main relief valve Unit: mm D85EX-15 10-35 No.

Check item Criteria Remedy 6 Clearance between main relief valve and valve body Standard size Tolerance Standard clearance Clearance limit Replace Shaft Hole 28 – 0.035 – 0.045 +0.013 0 0.035 – 0.058 0.078 7 Clearance between torque con- verter relief valve and valve body 22 – 0.035 – 0.045 +0.013 0 0.035 – 0.058 0.078 8 Main relief valve spring (outer) Standard size Repair limit Free length Installed length Installed load Free length Installed load 128 75.3 508.6 N {51.9 kg 124.2 } 483.2 N {49.3 kg} 9 Main relief valve spring (inner) 108 78.0 401.8 N {41.0 kg 104.8 } 381.7 N {39.0 kg} 10 Torque converter relief valve spring 50 40.5 182.1 N {18.6 kg 48.5 } 173 N {17.7 kg}