DISASSEMBLY AND ASSEMBLY FLOOR FRAME 25. Remove bracket (37) on the left side of the rear section. 29. Lift off floor frame assembly (40). a When lifting off the floor frame assembly, check that all the wires have been discon- nected. 26. Remove 4 rear mounting bolts (38) on each side. 4 Floor frame assembly: 440 kg 27. Remove 2 front mounting bolts (39) on each side. INSTALLATION Carry out installation in the reverse order to removal. [*1] [*4] a Adjust the brake pedal. For details, see TESTING AND ADJUSTING, Adjusting brake pedal and parking brake lever. [*2] a The connecting points of the PPC hoses are indicated by their band colors. When con- necting each hose, check its band color.
PPC ports of work equipment control valve assembly Ports for right side: (6) PA4 (Ripper lift cylinder RAISE port) (7) PA3 (Blade lift cylinder LOWER port) (8) PA2 (Blade tilt cylinder LEFT TILT port) Ports for left side: (9) PB4 (Ripper lift cylinder LOWER port) (10) PB3 (Blade lift cylinder RAISE port) (11) PB2 (Blade tilt cylinder RIGHT TILT port) 28. Sling floor frame assembly (40) to a height at which you can disconnect connector PT2 (42) of pitch angle sensor (41), and then disconnect the connector. [*3] a Install each hose so that it will not be twisted. a When installing the air conditioner hoses, take care that dirt, dust, water, etc. will not enter them.
a When tightening each joint of the air condi- tioner hose, check that O-ring (43) is fitted to it. 30-206 D85EX-15 (2)