Komatsu D155AX-6 — REMOVAL AND INSTALLATION OF FUEL INJECTOR ASSEMBLY

50 Disassembly and assembly SEN01205-00 2. Install high pressure pipe clamp and stay. 1) Temporarily tighten high pressure pipe clamp, stay (16), clamping bolts (38) through (42), and stay mounting bolt, with fingers. 2) Tighten permanently high pressure pipe clamping bolt. 3. Install the subsequent procedure in the reverse order of removal. [*1] 3 Joint bolt: 24.5 – 34.3 Nm {2.5 – 3.5 kgm} 3 Clamping bolt: 9.8 ± 1 Nm {1 ± 0.1 kgm} 3) Tighten permanently stay mounting bolt. 4) Temporarily tighten high pressure pipe clamp, stay (15), clamping bolts (44) through (48), and stay mounting bolt, with fingers. 5) Install cover (11). a Install with the notch toward cylinder block side.

6) Install high pressure pipe clamp (10) and gate type frame (9) temporarily. 7) Tighten clamping bolt for high pressure pipe clamp (10) permanently. [*2] 3 Clamping bolt (7): 9.8 ± 1 Nm {1 ± 0.1 kgm} [*3] 3 Cylinder head cover mounting bolt: 29.4 – 34.3 Nm {3.0 – 3.5 kgm} [*4] a Install with the notch downward. [*5] a When installing rocker arm and rocker shaft assembly (22), check the ball portion of adjust- ment screw (25) to be inserted securely into socket of push rod (23), and tighten mounting bolts. a As 3 mounting bolts are different each other, install them referring to the followings. 3 Clamping bolt: 9.8 ± 1 Nm {1 ± 0.1 kgm} 8) Tighten gate type frame (9) permanently.

9) Tighten high pressure pipe clamp, stay (15) and clamping bolts (44) through (48), permanently. q Mounting bolt (19): Stem length 120mm q Mounting bolt (20): Stem length 90 mm 3 Clamping bolt: 9.8 ± 1 Nm {1 ± 0.1 kgm} 10) Tighten permanently stay mounting bolt. 3 Mounting bolts (19), (20) and (21): 93 – 103 Nm {9.5 – 10.5 kgm} a Adjust valve clearance referring to the section of Testing and adjusting, "Adjusting valve clearance". q Mounting bolt (21): Stem length 75.2 mm D155AX-6 9