Komatsu D155AX-6 — REMOVAL AND INSTALLATION OF AFTERCOOLER ASSEMBLY

50 Disassembly and assembly SEN01205-00 Installation q Carry out installation in the reverse order of removal. [*1] [*2] a When loosened hose clamp, replace clamp with new one. a Tighten the hose clamp according to the fol- lowing procedure. 1) Locate punch mark (a) of bridge (9) as shown in the figure, and adjust the posi- tion of bridge to be under band (10). 2) Tighten bolt (11) so that dimension (b) is between 8 and 10 mm. 2 Threaded portion of bolts: PANDO 18B from Three Bond 3) Tighten bolt (11) with the following torque. 3 Bolt: 25 ± 5 Nm {2.55 ± 0.5 kgm} D155AX-6 25