Komatsu D155AX-6 — REMOVAL AND INSTALLATION OF ENGINE ASSEMBLY

50 Disassembly and assembly SEN01205-00 29. Sling engine assembly (30) and remove it. a Check all wires and pipes are removed. a Remove carefully to avoid any interfer- ence with the machine body. Installation q Carry out installation in the reverse order to removal. [*1] [*2] a When loosened hose clamp, replace clamp with new one. a Tighten the hose clamp according to the fol- lowing procedure. 1) Locate punch mark (a) of bridge (31) as shown in the figure, and adjust the posi- tion of bridge to be under band (32). 2) Tighten bolt (33) so that dimension (b) is between 8 and 10 mm. 2 Threaded portion of bolts: PANDO 18B from Three Bond 3) Tighten bolt (33) with the following torque. 3 Bolt:

25 ± 5 Nm {2.55 ± 0.5 kgm} [*3] 2 Engine side tube flange: Gasket sealant (LG-1) 3 Hose clamp: 8.8 ± 0.5 Nm {90 ± 5 kgcm} [*4] 3 Hose clamp: 8.8 ± 0.5 Nm {90 ± 5 kgcm} [*5] 3 Universal joint mounting bolt: 98 – 123 Nm {10 – 12.5 kgm} [*6] 3 Engine mount fixing bolt: 823.8 – 1029.7 Nm {84 – 105 kgm} q Charging air conditioner with refrigerant gas a Charge the air conditioner system with refriger- ant gas using tool Q. D155AX-6 29