OPERATION For both normal temperatures and cold temperatures, carry out the following operation. 16. Check to be sure fuel control dial (4) is at a point midway between low idling (MIN) and full speed (MAX). If it is not at the midway position, set it to the midway position and run the engine at a mid-range speed before operating. 17. Before starting operations, repeat the following operations slowly 3 to 5 times to circulate warm oil through the control circuits.
Boom operation RAISE (E) LOWER (F) Arm operation IN (B) OUT (A) Bucket operation CURL (D) DUMP (C) When carrying out swing operations, release swing lock switch (2), check to be sure swing lock monitor (19) goes out, then operate the swing. Swing operation Left (G) Right (H) Travel (Lo) operation FORWARD (A) REVERSE (B) Attachment operation One way (A) Other way (B) 18. Check to be sure hydraulic oil temperature monitor (7) is display- ing green. If the hydraulic oil temperature monitor is not displaying green (it is displaying white), repeat Steps 6 to 10 until the display is green.
If the hydraulic oil temperature monitor displays green, the hydraulic equipment warming-up operation is completed. After confirming that the hydraulic oil temperature monitor displays green, carry out the following procedure. 2-94 PC300LC/HD-7E0