MAINTENANCE EVERY 50 HOURS MAINTENANCE LUBRICATING Remark If any abnormal noise is generated from these points carry out greasing procedures regardless of interval timing. For new machines, grease every 10 hours for the first 50 hours of operation. Always grease the pins before and after using in wet locations. Set the work equipment in the greasing posture below, then stop the engine. Using a grease pump, pump in grease through the grease fittings shown by the arrow. After greasing, wipe off any old grease that was pushed out. LOCATIONS 1. Arm-Link coupling pin (1 point) 2. Arm-Bucket coupling pin (1 point) 3. Link coupling pin (2 places) 4. Bucket cylinder rod pin (1 place) 5.
Bucket-Link coupling pin (1 place) PC300LC/HD-7E0 3-45