Komatsu — OUTLINE OF SYSTEM

. ATTACHMENTS, OPTIONS HANDLING PAYLOAD METER (VHMS BUILT-IN TYPE) HANDLING PAYLOAD METER (VHMS BUILT-IN TYPE) 6 - 23 OUTLINE OF S YSTEM r detects the signals from the pressure sensors, clinometer, body float detection, neutral Th e payload mete detection, and trav el speed detection, and uses th e microcomputer built into the controller to calculate the payload. Th e calculated pay load is displayed on the character display on the machine monitor; the external display lamps cter displa the machine monitor; the e als o display the pa yload condition. Th e date stored in the payload meter can be down loaded to a personal computer using the s eparately sold special software.

For detai ls of the special so ftware, plea se consult your Komatsu distributor. To ensure accurac y when operating t he system, apply the p arking brake when dumping, set the grar shift lever to N, release the reta rder brake, and set so that the machine a nd payload display are both sta ble before starting the dumping operation . If the machine is s topped sud denly at the dumping point, it will take time f or the payload display to stabilize. umping on flat ground. Always carry out d umping on flat gro Payload display (Charactor display External display Download conn ector inside cab M) ding, remove the connected cable.

After ( end marked PL When downloa After completing the d ownload operation , do not forg et to restor e the cable to its origi nal position. If it is not restore d, the download operation canno t be carried out fro m outside th e operator's cab