. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE bar center 4 - 48 (5) Ripper tilt cylinder bottom p (6) Ripper lift cylinder bottom p (7) Ripper tilt cylinder rod end (8) Ripper lift cylinder rod end (9) Ripper arm pin (front) (2 pla (10)Ripper ar m pi n (rear) (2 pla The illustratio n on the right sho ws Giant Ripp er (if equipped). (11 ) Equalizer bar sid e shaft (2 places) (12 ) Suspension ( Equalizer ba r center shaft) (1 place) haft) through the g rease fitt ings marked b y arrows 2) Pump the g reasing lever up and down 3 to 5 times.