. ATTACHMENTS, OPTIONS EFFECTIVE METHOD OF OPERATION FOR DUAL TILT DOZER PUSHING-UP SOIL 6 - 10 1. Dig (A) with S TRAIGHT PITC H (1). se REAR PITCH (2). WARD PITCH (3). ). When digging gradually (A), u se REAR PITCH (2). If the g round i s hard, use FOR 2. Haul ( B) with REAR PITCH (2 If there is any spillage of soil o ver the top of the bla de, change to STRA IGHT PITCH ( 3. Dump the soil (C) with FORW ARD PITCH (3). s carried back. This d umps th e soil more effe ctively, and less soil i s carried