Komatsu — INDEX

. INDEX INDEX 67 2 5 9 9 2 2 2 3 2 2 5 21 21 5 DOOR OPEN LOCK 50 DOOR POCKET 51 DUST INDICATOR 45 12 11 12 8 5 7 - 1 ACCUMULATOR, HA ADJUSTIN G POSTUR E OF WORK EQUIPME AIR CONDITIONER, H ANDLING ASHTRAY 3 - 1 - 3 - L , LEFT/RIGHT OF MACHINE FRONT PANE FRONT/REAR , LEFT/RIGHT DIRECTIONS FUSE BOX K FUSIBLE LIN 3 - 122 3 - 61 3 - 51 1 - 3 - 3 - 7 46 49 BLADE SE RIAL NO.

P LATE POSITION 1 - GENERAL PR ECAUTIONS GENERAL PR ECAUTIONS PRECAUTI ONS RELATED TO SAFETY EW EW OF CONTROLS AND GENERAL VI GENERAL VI EW OF CONTROL S AND GAUGES EW OF MACHINE AINTENANCE GENERAL VI GUIDES TO M AINTENANCE 2 - 6 - CAP WITH LOCK, HA METHO D OF OPEN ING AND CLOSIN G CAP WIT CAR STEREO, HAND CHECK A FTER FINIS CHECK A FTER STOP PING ENGIN CHECK B EFORE STA RTING ENGINE, ADJUST COLD WE ATHER OP ERATION AFTER COLD WEA AFTER COMPLETI ON OF WORK PRECAUTIONS FO TEMPERATURE PEDALS CONTROL LEVERS, 6 - 6 - 3 - 6 - 5 53 5 3 - 53 3 - 111 3 - 95 3 - 3 - 4 - 3 - 68 3 - 131 3 - 132 3 - 132 HANDLING M ACHINES EQUIPPED WITH KOMTR BASIC PRE CAUTION HANDLING O IL, FUEL, COOLANT, AND PERFORMIN G OIL CLINIC 6 - 6 - 3 - 131 3 - 36 4 - INSTALLATIO N OF CAB INTRODUCTI 3 - 3 - 3 - 3 - 130 1 - 7 LOADING, UN LOADING WORK LOCKING STORAGE ORAGE TORAGE TORAGE MACHINE AFTER M STORAGE LONG-TERM STORAG AFTER ST BEFORE S DURING S STARTING MACHINE AFTER LONG-TER M STORAGE EFFECTIV E METHOD OF OPERATION FOR DUA L TILT DOZ BLADE CONDITION BOULD ER RAISING OPERATIO DITCHI NG OPERA DOZING WORK HORIZONTAL DOZ OPERATIONS FRO M SIDE SLOPE (ROUG H GROUND LEVELI NG (SPREA OPERATION SIDE-CUTTING OP ERATIONS ENGINE S ERIAL NO.

POSITION EXPLANATION OF C OMPONENTS 3 - 127 3 - 111 3 - 133 3 - 133 3 - 133 3 - 133 6 - 6 - 6 - 6 - 6 - 6 6 11 11 8 3 - 133 6 - MACHINE SE RIAL NO. PLATE A ND POSITION E SCHEDULE CHART LIFTING MACHINE HINE MAINTENANC E SCHEDULE CHART METHOD OF LIFTING M ACHIN MOVING MAC 6 - 6 - 1 - 8 4 - 16 3 - 128 3 - 96 1 - 3 -