Komatsu D65EX-15E0, D65PX-15E0, D65WX-15E0 — WHOLE DISASSEMBLY AND WHOLE ASSEMBLY OF TRACK SHOE ASSEMBLY

50 Disassembly and assembly SEN00950-00 7) Adjust the dimensions of the press fitting jig of the link press to keep the projection of the pin and bushing constant and keep the installed dimensions of the seal within the standard range. q Dimension c: 3 mm d: 3 mm e: 49.7 mm a If the pin end (part f ) or link sides (parts g and h ) are worn, add the dimensions of the worn parts when adjusting the standard dimensions so that the projections of the pins and bushings on both sides will be even. 2) Press fit the master links on both bushing sides to the bushing with the shoe fitting faces up. a At this time, use the master links on the pin side as supports. a Press fitting force for bushing:

98 – 147 kN {10 – 15 tons} a Set the link receiving face of jaw [4] vertically. a Wear plate [5] should be a replace- able one, if possible. 3) Using the shoe bolt hole pitch gauge, press fit the master links until the distance between the shoe bolt holes of both links is the standard value. a Remove the all steel chips caused by press fitting of the bushing with com- pressed air. 4) Turn over the master links and check that they are press fitted in parallel. 2. Assembly of link 1) Apply lithium grease (G2-LI) to the mating surfaces of the pin and bushing and assemble them, then set them before the jaw of the link press.

a When reusing (reversing) the bush- ing, set the worn outside surface of the bushing on the shoe fitting side of the link (set the bushing with the worn outside surface up on the link press). D65EX, PX, WX-15E0 15