Komatsu D65EX-15E0, D65PX-15E0, D65WX-15E0 — WHOLE DISASSEMBLY AND WHOLE ASSEMBLY OF TRACK SHOE ASSEMBLY

50 Disassembly and assembly SEN00950-00 3. Installation of shoe 1) Set the link assembly on the bed and install the shoe with a shoe bolt impact wrench and a torque wrench. 2 Shoe bolt: Lubricant containing molybde- num disulfide (LM-P) 3 Shoe bolt (Regular link) Initial torque: 539 ± 49 Nm {55 ± 5 kgm} Retightening angle: 120є ± 10є 2) When a 2-piece track is used, place the assembled 2 shoes on a level place in 1 line with the shoe side up. 3) Pull pin-side master link (5) and bushing- side master link (6) together and set them to each other by the mating faces. 4) Place shoe (7) on the links and fit the mat- ing faces of the links.

5) Check that shoe bolts (8) can be tightened easily, then connect the links with the master bolts. 2 Shoe bolt: Lubricant containing molybde- num disulfide (LM-P) 3 Shoe bolt (Master link) Initial torque: 343 ± 39 Nm {35 ± 4 kgm} Retightening angle: 180є a Tighten the bolts in the order of 1 – 4. 0є –20є D65EX, PX, WX-15E0 17