Komatsu D65EX-15E0, D65PX-15E0, D65WX-15E0 — CONTROL VALVE

10 Structure, function and maintenance standard SEN00286-01 Function q This improves the response of the system including the pump swash plate and pressure compensation valve by sending the pilot pres- sure (basic pressure of PPC valve) to the LS circuit, and compensating the rise of the LS cir- cuit pressure. Operation q When lift valve spool (1) is at the “hold“ posi- tion, pilot pressure (P1) (basic pressure of PPC valve) is sent through preset check valve (3) to chamber (F) of the pressure compensa- tion valve. This pressure is called preset pres- sure (P2). q At the same time, unload pressure (P) is being sent to chamber (B), but (P1) + (F0) > (P) (F0:

load of spring (4)), so pressure compensation spool (2) moves to the left and the size of the opening between chambers (A) and (B) becomes the maximum. q When spool (1) is switched, unload pressure (P) flows immediately through chambers (A), (B), (C), (D) and (E) to lift cylinder (8), so the pressure at the port starts to rise and the time lag becomes smaller. q At the same time, preset pressure (P2) is sup- plied to LS circuit (O) by the timing of the spool, and the pressure in the LS circuit rises. q Because of this, unload valve (7) closes, and oil is sent further to pump LS valve (6) to improve the response of the pump swash plate angle.

This makes it possible to reduce the response time for giving the necessary oil flow. q Check valve (5) is installed in the spool so that preset pressure (P2) will not be applied to the cylinder port. q If cylinder port pressure (P3) rises higher than preset pressure (P2), the oil pushes up check valve (5) and flows through chamber (F) of the pressure compensation valve to pump LS valve (6), and then the normal ( d PLS) control starts. q At this time, check valve (3) prevents cylinder port pressure (P3) from entering the pilot pres- sure circuit. D65EX, PX, WX-15E0 35