2-15 CONTROLLER TRAVELING/MATERIAL HANDLING CONTROLLER ASSY REMOVAL INSTALLATION (15 ~ 32 MODEL) Caution: Before starting the job, measure the voltage between P14 and N1; if there is any voltage, insert a resistor at approx. 100 Ω between P14 and N1 to discharge the capacitor. T = N m (kgf-cm) [ft-lbf] Removal Procedure 1 Disconnect the battery plug. 2 Remove the side cover LH. 3 Remove the contactor panel ASSY. (See page 2-21) 4 Disconnect the connectors and terminals from the traveling/material handling controller ASSY. 5 Remove the controller ASSY. Installation Procedure The installation procedure is the reverse of the removal procedure.

5 4 3 2 M Nut connecting controller to cable M 8 T = 11 ~ 15 (112 ~ 153) [8.1 ~ 11.1] 10 T = 15 ~ 19 (153 ~ 194) [11.1 ~ 14.0]