2-17 MATERIAL HANDLING CONTROLLER ASSY REMOVAL INSTALLATION (35 ~ 55 MODEL) Caution: Before starting the job, measure the voltage between P12 and N2; if there is any voltage, insert a resistor at approx. 100 Ω between P12 and N2 to discharge the capacitor. T = N m (kgf-cm) [ft-lbf] Removal Procedure 1 Disconnect the battery plug. 2 Remove the side cover LH. 3 Remove the controller cover. 4 Disconnect the connectors and terminals from the material handling controller ASSY. 5 Remove the controller ASSY. Installation Procedure The installation procedure is the reverse of the removal procedure.
3 4 5 2 Nut connecting controller to cable M8 T = 11 ~ 15 (112 ~ 153) [8.1 ~ 11.1] M10 T = 15 ~ 19 (153 ~ 194) [11.1 ~ 14.0]