DISASSEMBLY AND ASSEMBLY GENERAL ASSEMBLY 31. Crosshead assembly Install crosshead. * Adjust the crosshead (1) according to the following procedure. i) Loosen the locknut, and return the adjustment screw. ii) Press the top your fingers, of the crosshead lightly with and tighten the adjustment screw. iii) Tighten 20 degrees further after the adjust- ment screw contacts the valve stem. iv) Tighten the locknut at this point. 6-39] 32. Locknut: 4.0 + 0.5 kgm Nozzle holder * Confirm that there is no dust in the nozzle holder sleeve. Install nozzle holder (2), and tighten bolts (1). * Tighten the bolts alternately and evenly. Gs] 33. Mounting bolt: 2.75 + 0.25 kgm Push rod Install push rod (1).
34. Rocker arm assembly Install the gasket, then install rocker arm assembly (1). * Confirm that the ball of the adjustment screw is fitted to the socket of the push rod, and tighten the bolt. * Before bolt. installing the bolt, wash its oil hole of Mounting bolt: 10.0 + 0.5 kgm 16162P107 170-1 SERIES 13-37