PACCAR Inc. — Maintenance Schedule

PREVENTIVE MAINTENANCE SCHEDULE 5 5-26 PREVENTIVE MAINTENANCE (PM) INTERVALS SYSTEM COMPONENT MAINTENANCE TASK Recommended PM Interval I A B C D E Power Steering Steering intermediate shaft U-joints (ON HIGHWAY) Lubricate [EP NLGI #2 HD grease, +325° F to -10° F (+163° C to -23° C) range]. X X Steering intermediate shaft U-joints (OFF HIGHWAY or CITY DELIVERY) Lubricate [EP NLGI #2 HD grease, +325° F to -10° F (+163° C to -23° C) range]. X X Draglink and tie rod arm ball sockets (ON HIGHWAY) Lubricate (EP NLGI #2 lithium-based, moly-filled, HD grease). X X Draglink and tie rod arm ball sockets (OFF HIGHWAY or CITY DELIVERY) Lubricate (EP NLGI #2 lithium-based, moly-filled, HD grease).

X X Fuel & Tanks Fuel tanks Inspect tanks, brackets, hoses, and fittings for correct location, tightness, abrasion damage, and leaks; repair or replace as required. X Fuel tank breathers Check for proper function; clean the drain hoses. X Fuel tank straps Check the strap tightness; tighten to proper torque value as required: Aluminum tank: 30 Lb. ft. (41 N.m.) Cylindrical Steel tank: 8 Lb. ft. (11 N.m.) X X