. OPERATION MACHINE OPERATIONS AND CONTROLS REMARK it is in light NOTICE 3 - 170 Inversion 1. Place t he bucket in con tact with a flat surfa Whe n rem contact wit If th e buck et is lowered str ongly to the ground, b e increas ed and it will be difficult to remove th e pins. After removi ng the pins, make sure that mud or sand does no t get on t hem. Dust seals a re fitted at both en ds of the bushings, be careful n ot t o damage them 2. Remov e the double nut on the stopper bolt for arm pin (A) and ink pin (B), remove the bolt, pull out arm pin (A) and lin k pin (B), and th en remove the b 3. Turn th e removed buc ket.
After turning th e bucket, align the arm (5) with link mounti ng hole (1), then ali gn the l ink with arm mounti ng hole (2) and i nstall. 4. Align th e arm with hole s (1) of the replacem ent bucket and the l i ink wit h holes (2), then insert grease-coat ed pins (A) and (B) (A) and (B) nto ho le (1) and hole ( 2) respectively.