. MAINTENANCE MAINTENANCE PROCEDURE EVERY 500 HOURS MAINTENANCE LUBRICATING NOTICE 4 - 52 Maintenan ce for every 100 and 25 0 hours sho uld be ca rried out a t the I f any ab normal noise is generated from a ny grea sing poin t, carr y out greasing regardless of the gre Carry ou t greasing eve ry 10 hours f or the first 50 hours on a new machine. Carry out the greasing a lso at 250 hours and 500 ours on a new machi After the machine was subjected to jobs i n the w ater, be su re to grease the When ca rrying out hea vy-duty operations , such as hydraul ic breaker o perations, carry out the greas 1.
Set th e machine t o the greasi ng po sture shown o n the right, lower the work equ ipment to th e ground, th en stop t he engine. 2. Using a grease p ump, pump fittings shown by a 3. After g reasing, wip e off any ol d grease tha t was pu shed (1) Boom cylinder foot pin (2 place (2) Boom foot pin (2 pl aces) (3) Boom cylinder rod end pin (2 p laces (4) Arm cy linder foot pi n (1 place)