. MAINTENANCE MAINTENANCE PROCEDURE 4 - 79 EVERY 4000 HOURS MAINTENANCE Carry out the periodic maintenance work of every 100,250, 500 , 1000 and 2000 hours of o peration at the same time. CHECK WATER PUMP Check for leakage of water and oil around the water pump . If any problem i s found, please ask your Komatsu distributor to carry out disassembly, repair, or replacement.