136 Assembly process No. Lubricating (1/3) A-22 1. Blade lift cylinder support yoke (4 places) Fig. 1 (Fig. 1) 2. Blade lift cylinder support shaft (2 places) (Fig. 1) 3. Blade arm ball joint (3 places) (Fig. 2) Fig. 2 4. Brace screw (2 places) (Fig. 2) 5. Ripper tilt cylinder bottom pin (2 places) Fig. 3 (Fig. 3) 6. Ripper lilt cylinder bottom pin (2 places) (Fig. 3) 7. Ripper tilt cylinder rod end pin (2 places) (Fig. 3) 8. Ripper lilt cylinder rod end pin (2 places) (Fig. 3) 9. Ripper arm pin (front) (2 places) (Fig. 3) 10. Ripper arm pin (rear) (2 places) (Fig.
3) Precautions Necessary tools Necessary equipment About the kind of used fluids refer to “Assembly procedure A-20” Check on the amount of lubricants and coolant. For other related matters, confirm them by Operation Manual. Name Q'ty Name Q'ty Other remarks